SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
← SRR Final

🔧 WO 100135805

2 materials reference this work order
300-SP-2.000 MSPE no_fixed FWA 21/1046 Material value (GL): $16,461
KIT, FLANGE INSULATION: 2", CLASS 300, RF, DATASHEET KPO-00-PIP-DTS-00801 *INCLUSIVE OF BOLTS/NUTS, GASKET, SLEEVE, WASHER*
Order #
100135805
Priority
3
Storage location
PKPC
Target finish
2026-05-06
User status
APPR
Criteria
Criteria 8
Tier / ORA / SCE
T:N O:N S:N
Order Qty
1.0
Vendor
2000928 KLINGER LTD
First / Last seen
May 2026 · refresh 2026-05-24 → July 2026 (2×)
Other work orders for this material (3)
300338675 · prio 4 · PKPC 100138537 · prio 5 · PKPC 100138543 · prio 5 · PKPC
300-SP-2.000 MSPE no_fixed FWA 25/0511 Material value (GL): $19,680
KIT, FLANGE INSULATION: 2", CLASS 300, RF, DATASHEET KPO-00-PIP-DTS-00801 *INCLUSIVE OF BOLTS/NUTS, GASKET, SLEEVE, WASHER*
Order #
100135805
Priority
3
Storage location
PKPC
Target finish
2026-05-06
User status
APPR
Criteria
Criteria 8
Tier / ORA / SCE
T:N O:N S:N
Order Qty
1.0
Vendor
2000928 KLINGER LTD
First / Last seen
August 2026 (1×)
Other work orders for this material (3)
300338675 · prio 4 · PKPC 100138537 · prio 5 · PKPC 100138543 · prio 5 · PKPC