SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
← SRR Final

🔧 WO 100127900

3 materials reference this work order
2494 RSPE no_fixed FWA 21/0925 Material value (GL): $121.10
LAMP, TUBULAR: 24 VOLT, 3 WATT, BA9S, LENGTH / DIAMETER - 23MM X 9MM
Order #
100127900
Priority
3
Storage location
PUN3
Target finish
2025-09-25
User status
APPR
Criteria
Criteria 8
Tier / ORA / SCE
T:N O:N S:N
Order Qty
200.0
Vendor
2004695 NUOVO PIGNONE INTERNATIONAL
First / Last seen
May 2026 → August 2026 (9×)
2494 RSPE skip Material value (GL): $0.00
LAMP, TUBULAR: 24 VOLT, 3 WATT, BA9S, LENGTH / DIAMETER - 23MM X 9MM
Order #
100127900
Priority
3
Storage location
PUN3
Target finish
2025-09-25
User status
APPR
Criteria
Criteria 8
Tier / ORA / SCE
T:N O:N S:N
Order Qty
200.0
Vendor
2004695 NUOVO PIGNONE INTERNATIONAL
First / Last seen
June 2026 (1×)
72251 skip FWA 26/0351 Material value (GL): $0.00
TRANSMITTER, PRESSURE: MODEL 3051, RANGE 0…99, 2BARG, C/W DIAPHRAGM 1199WDC54AFCWG4KB00BQ15, MEASUREMENT TYPE GAUGE, PRESSURE RANGE 4000 PSI (275.79 BAR), OUTPUT 4-20 MA
Order #
100127900
Priority
3
Storage location
PUN3
Target finish
2025-09-25
User status
APPR
Criteria
Criteria 8
Tier / ORA / SCE
T:N O:N S:N
Order Qty
1.0
Vendor
2001135 EMERSON PROCESS MANAGEMENT
First / Last seen
August 2026 (1×)