SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · FBBS7A000E1S

FBBS7A000E1S

FBBS7A000E1S, 20.000 X 125.000, BOLT, STDBLT, M20X125MM, A320L7M/7M, STUD BOLT THREADED FULL LENGTH ALLOY STEEL PER ASTM A320-L7M WITH TWO CARBON STEEL NUTS PER A194-7M THREADS TO ISO METRIC DIN 13 WITH NUTS TO DIN 934
FPAL 2.3.7.0 · Basic Consumables · Nature Gen.Consum

Категория материала

Piping & Bulk Material Fittings Spare
FPAL2.3.7.0 из SAP

Stock & pipeline (latest SRR snapshot)

Total balance
120.0
Reserved
208.0
Qty in PR
0
Qty in PO
0.0
In refurbishment
0
Price (USD)
$11.36
Moving average (USD)
Revised SRR qty
145.0
Revised SRR value
$1,647

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да Other (PR) 145 $11.36 $3.92 $1,647
July 2026 ✓ Да Other (PR) 165 $11.29 $3.92 $1,863
June 2026 ✓ Да Other (PR) 137 $11.53 $3.98 $1,580
May 2026 ✓ Да Other (PR) 16 $11.59 $3.98 $185.44
April 2026 ✓ Да Other (PR) 134 $11.37 $3.98 $1,524
March 2026 ✓ Да Other (PR) 134 $3.24 $3.82 $434.16
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
PIPING
Line Type
General Line
Criticality
3.0
ABC indicator
C
Class
BOLT_PIPE_KPO · BOLT- PIPE FITTING – KPO
MRP Area / Type / Lot
1000_PKPC · VB · HB
Primary vendor
2001705 GLOBAL PIPE COMPONENTS LIMI
Last PO
26/0071 · 5002029 IBEMO KAZAKHSTAN LLP · 72.0 × 9.9 EUR

Contracts (FWAs) — 0

This material is not registered in any contract yet.

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 16 active reservations from last SRR snapshot Storage: PKPC
Order Prio Storage Target finish Status Criteria T/O/S Qty
201065321 3 PKPC 2025-06-08 APPR Criteria 8 T:N O:N S:N 16.0
201076416 3 PKPC 2026-09-08 APPR Criteria 8 T:N O:N S:N 16.0
201076417 3 PKPC 2026-09-08 APPR Criteria 8 T:N O:N S:N 16.0
201076418 3 PKPC 2026-09-08 APPR Criteria 8 T:N O:N S:N 16.0
201076419 3 PKPC 2026-09-08 APPR Criteria 8 T:N O:N S:N 16.0
201253520 3 PKPC 2027-04-21 APPR Criteria 8 T:N O:N S:N 16.0
201258172 3 PKPC 2028-10-27 APPR Criteria 8 T:N O:N S:N 16.0
201260371 3 PKPC 2026-09-28 WPRE INPR Criteria 8 T:N O:N S:N 8.0
201266826 3 PKPC 2027-06-11 APPR Criteria 8 T:N O:N S:N 16.0
300320660 3 PKPC 2026-09-21 APPR Criteria 6 T:N O:N S:Y 8.0
300320662 3 PKPC 2026-09-21 APPR Criteria 6 T:N O:N S:Y 8.0
201256611 4 PKPC 2027-08-26 APPR Criteria 6 T:N O:N S:Y 12.0
201272050 4 PKPC 2027-08-18 APPR Criteria 6 T:N O:N S:Y 12.0
201278160 4 PKPC 2027-09-20 APPR Criteria 6 T:N O:N S:Y 12.0
201278161 4 PKPC 2027-11-19 APPR Criteria 6 T:N O:N S:Y 12.0
100118241 5 PKPC 2028-10-26 APPR Criteria 2 T:N O:N S:N 0