Worklist · Material · FBBS7A000E1R

FBBS7A000E1R

FBBS7A000E1R, 20.000 X 115.000, BOLT, STDBLT, M20X115MM, A320L7M/7M, STUD BOLT THREADED FULL LENGTH ALLOY STEEL PER ASTM A320-L7M WITH TWO CARBON STEEL NUTS PER A194-7M THREADS TO ISO METRIC DIN 13 WITH NUTS TO DIN 934
FPAL 2.3.7.0 · Basic Critical Spares · Nature Consumable

Категория материала

Piping & Bulk Material Fittings Spare
FPAL2.3.7.0 из SAP

Stock & pipeline (latest SRR snapshot)

Total balance
21.0
Reserved
16.0
Qty in PR
0
Qty in PO
0.0
In refurbishment
0
Price (USD)
$15.09
Moving average (USD)

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да Other (PR) 63 $15.09 $4.60 $950.67
July 2026 ✓ Да Other (PR) 55 $15.00 $4.60 $825.00
June 2026 ✓ Да Other (PR) 87 $15.31 $4.89 $1,332
May 2026 ✓ Да No Fixed 87 $15.40 $4.89 $1,340
April 2026 ✓ Да No Fixed 103 $15.11 $4.90 $1,556
March 2026 ✓ Да No Fixed 87 $6.08 $4.90 $528.96
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
PIPING
Line Type
General Line
Criticality
3.0
ABC indicator
C
Class
BOLT_PIPE_KPO · BOLT- PIPE FITTING – KPO
MRP Area / Type / Lot
1000_PUN3 · VB · HB
Primary vendor
2001705 GLOBAL PIPE COMPONENTS LIMI
Manufacturer
Not applicable - ie pipeline...
Last PO
26/0071 · 5002029 IBEMO KAZAKHSTAN LLP · 48.0 × 13.15 EUR

Contracts (FWAs) — 0

This material is not registered in any contract yet.

Comments from latest SRR

Calculation: Rule 1

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 18 active reservations from last SRR snapshot Storage: PKPC PUN3
Order Prio Storage Target finish Status Criteria T/O/S Qty
201070477 3 PKPC 2026-09-07 APPR Criteria 6 T:N O:N S:Y 16.0
300320214 3 PKPC 2027-09-01 APPR Criteria 6 T:N O:N S:Y 8.0
300320216 3 PKPC 2027-08-31 APPR Criteria 6 T:N O:N S:Y 8.0
300320218 3 PKPC 2027-09-04 APPR Criteria 6 T:N O:N S:Y 8.0
300320220 3 PKPC 2027-09-07 APPR Criteria 6 T:N O:N S:Y 8.0
300320255 3 PKPC 2027-09-05 APPR Criteria 6 T:N O:N S:Y 1.0
300320258 3 PKPC 2027-09-10 APPR Criteria 6 T:N O:N S:Y 7.0
300320260 3 PKPC 2027-09-08 APPR Criteria 6 T:N O:N S:Y 8.0
300320262 3 PKPC 2026-09-20 APPR Criteria 6 T:N O:N S:Y 8.0
300320264 3 PKPC 2027-09-04 APPR Criteria 6 T:N O:N S:Y 8.0
300320266 3 PKPC 2027-09-01 APPR Criteria 6 T:N O:N S:Y 8.0
300320277 3 PKPC 2027-09-01 APPR Criteria 6 T:N O:N S:Y 8.0
300320281 3 PKPC 2027-09-12 APPR Criteria 6 T:N O:N S:Y 8.0
300320285 3 PKPC 2027-08-29 APPR Criteria 6 T:N O:N S:Y 8.0
300320289 3 PKPC 2027-08-31 APPR Criteria 6 T:N O:N S:Y 8.0
100121297 4 PKPC 2026-10-30 APPR Criteria 8 T:N O:N S:N 8.0
100112825 5 PUN3 2026-10-20 APPR WPRE Criteria 2 T:N O:N S:N 0
100118241 5 PKPC 2028-10-26 APPR Criteria 2 T:N O:N S:N 0