SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · FBBS7A000E11

FBBS7A000E11

FBBS7A000E11, 16.000 X 125.000, BOLT, STDBLT, M16X125MM, A320L7M/7M, STUD BOLT THREADED FULL LENGTH ALLOY STEEL PER ASTM A320-L7M WITH TWO CARBON STEEL NUTS PER A194-7M THREADS TO ISO METRIC DIN 13 WITH NUTS TO DIN 934
FPAL 2.3.7.0 · Basic Consumables · Nature Gen.Consum

Категория материала

Piping & Bulk Material Fittings Spare
FPAL2.3.7.0 из SAP

Stock & pipeline (latest SRR snapshot)

Total balance
180.0
Reserved
736.0
Qty in PR
0
Qty in PO
548.0
In refurbishment
0
Price (USD)
$2.43
Moving average (USD)
Revised SRR qty
16.0
Revised SRR value
$38.88

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да No Fixed 16 $2.43 $2.20 $38.88
July 2026 ✓ Да No Fixed 204 $2.42 $2.04 $493.68
June 2026 ✓ Да No Fixed 144 $2.47 $2.03 $355.68
May 2026 ✓ Да No Fixed 260 $9.74 $2.03 $2,532
April 2026 ✓ Да No Fixed 44 $9.56 $2.03 $420.64
March 2026 ✓ Да No Fixed 12 $5.21 $2.03 $62.52
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
PIPING
Line Type
General Line
Criticality
3.0
ABC indicator
C
Class
BOLT_PIPE_KPO · BOLT- PIPE FITTING – KPO
MRP Area / Type / Lot
1000_PKPC · VB · HB
Primary vendor
2001705 GLOBAL PIPE COMPONENTS LIMI
Last PO
26/0344 · 5004801 TURANMUNAYCONSULTING LLP · 156.0 × 2.12 EUR

Contracts (FWAs) — 1

STUDBOLT MANUFACTURING LLP
MSPE
unclaimed

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles · owned by MSPE

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 42 active reservations from last SRR snapshot Storage: PKPC
Order Prio Storage Target finish Status Criteria T/O/S Qty
100123434 3 PKPC 2025-05-21 APPR WPLC Criteria 8 T:N O:N S:N 16.0
100128929 3 PKPC 2025-10-30 APPR Criteria 8 T:N O:N S:N 16.0
100128932 3 PKPC 2025-10-30 APPR Criteria 8 T:N O:N S:N 16.0
100128933 3 PKPC 2025-10-30 APPR Criteria 8 T:N O:N S:N 16.0
100128934 3 PKPC 2025-10-30 APPR Criteria 8 T:N O:N S:N 16.0
100136404 3 PKPC 2026-05-25 APPR Criteria 8 T:N O:N S:N 16.0
201076405 3 PKPC 2026-09-08 APPR Criteria 8 T:N O:N S:N 16.0
201254910 3 PKPC 2026-07-25 APPR Criteria 8 T:N O:N S:N 64.0
201260372 3 PKPC 2026-09-23 APPR Criteria 8 T:N O:N S:N 64.0
300320306 3 PKPC 2026-09-13 APPR Criteria 6 T:N O:N S:Y 8.0
300320320 3 PKPC 2026-09-22 APPR Criteria 6 T:N O:N S:Y 12.0
300320322 3 PKPC 2026-09-22 APPR Criteria 6 T:N O:N S:Y 12.0
300320324 3 PKPC 2026-09-20 APPR Criteria 6 T:N O:N S:Y 8.0
300320326 3 PKPC 2026-09-19 APPR Criteria 6 T:N O:N S:Y 8.0
300320328 3 PKPC 2026-09-21 APPR Criteria 6 T:N O:N S:Y 12.0
300320334 3 PKPC 2027-09-21 APPR Criteria 6 T:N O:N S:Y 8.0
300320337 3 PKPC 2026-09-23 APPR Criteria 6 T:N O:N S:Y 4.0
300320339 3 PKPC 2026-09-23 APPR Criteria 6 T:N O:N S:Y 4.0
300320385 3 PKPC 2026-09-20 APPR Criteria 6 T:N O:N S:Y 8.0
300320768 3 PKPC 2027-09-18 APPR Criteria 6 T:N O:N S:Y 4.0
300320774 3 PKPC 2026-09-22 APPR Criteria 6 T:N O:N S:Y 8.0
300320778 3 PKPC 2026-09-22 APPR Criteria 6 T:N O:N S:Y 8.0
300320781 3 PKPC 2027-08-05 APPR Criteria 6 T:N O:N S:Y 4.0
300320784 3 PKPC 2026-09-10 APPR Criteria 6 T:N O:N S:Y 4.0
300320824 3 PKPC 2027-09-25 APPR Criteria 6 T:N O:N S:Y 4.0
300320866 3 PKPC 2027-09-24 APPR Criteria 6 T:N O:N S:Y 4.0
300320903 3 PKPC 2027-09-12 APPR Criteria 6 T:N O:N S:Y 12.0
300320906 3 PKPC 2026-09-23 APPR Criteria 6 T:N O:N S:Y 8.0
300320913 3 PKPC 2026-09-16 APPR Criteria 6 T:N O:N S:Y 4.0
300320918 3 PKPC 2027-06-04 APPR Criteria 6 T:N O:N S:Y 4.0
300320922 3 PKPC 2027-09-28 APPR Criteria 6 T:N O:N S:Y 4.0
300320930 3 PKPC 2027-09-27 APPR Criteria 6 T:N O:N S:Y 4.0
100138240 4 PKPC 2027-05-20 APPR Criteria 8 T:N O:N S:N 16.0
100139363 4 PKPC 2027-06-23 APPR Criteria 8 T:N O:N S:N 16.0
201178611 4 PKPC 2026-09-01 APPR Criteria 6 T:N O:N S:Y 96.0
201196071 4 PKPC 2026-10-31 APPR Criteria 6 T:N O:N S:Y 96.0
201256611 4 PKPC 2027-08-26 APPR Criteria 6 T:N O:N S:Y 96.0
201272050 4 PKPC 2027-08-18 APPR Criteria 6 T:N O:N S:Y 96.0
201278160 4 PKPC 2027-09-20 APPR Criteria 6 T:N O:N S:Y 96.0
201278161 4 PKPC 2027-11-19 APPR Criteria 6 T:N O:N S:Y 96.0
100118215 5 PKPC 2028-10-25 APPR Criteria 2 T:N O:N S:N 0
300304266 5 PKPC 2026-09-14 APPR Criteria 6 T:N O:N S:Y 4.0