SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · FBBS7A000E0Y

FBBS7A000E0Y

FBBS7A000E0Y, 16.000 X 100.000, BOLT, STDBLT, M16X100MM, A320L7M/7M, STUD BOLT THREADED FULL LENGTH ALLOY STEEL PER ASTM A320-L7M WITH TWO CARBON STEEL NUTS PER A194-7M THREADS TO ISO METRIC DIN 13 WITH NUTS TO DIN 934
FPAL 2.3.7.0 · Basic Consumables · Nature Gen.Consum

Категория материала

Piping & Bulk Material Fittings Spare
FPAL2.3.7.0 из SAP

Stock & pipeline (latest SRR snapshot)

Total balance
10.0
Reserved
64.0
Qty in PR
0
Qty in PO
0.0
In refurbishment
0
Price (USD)
$0.79
⚠ ×9 ниже нормы
Moving average (USD)
Revised SRR qty
54.0
Revised SRR value
$42.66

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да Other (PR) 54 $0.79 $2.51 $42.66
July 2026 ✓ Да Other (PR) 54 $7.40 $2.51 $399.60
June 2026 ✓ Да Other (PR) 54 $7.56 $2.60 $408.24
May 2026 ✓ Да Other (PR) 54 $7.60 $2.60 $410.40
April 2026 ✓ Да Other (PR) 54 $7.46 $2.59 $402.84
March 2026 ✓ Да Other (PR) 54 $0.79 $1.88 $42.66
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
PIPING
Line Type
General Line
Criticality
3.0
ABC indicator
C
Class
BOLT_PIPE_KPO · BOLT- PIPE FITTING – KPO
MRP Area / Type / Lot
1000_PGTH · VB · HB
Primary vendor
2001705 GLOBAL PIPE COMPONENTS LIMI
Last PO
25/0464 · 9.0 × 0.79 USD

Contracts (FWAs) — 0

This material is not registered in any contract yet.

Comments from latest SRR

Calculation: Rule 6

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 33 active reservations from last SRR snapshot Storage: PGTH PKPC
Order Prio Storage Target finish Status Criteria T/O/S Qty
100056275 3 PKPC 2019-10-10 APPR Criteria 8 T:N O:N S:N 24.0
201065321 3 PKPC 2025-06-08 APPR Criteria 8 T:N O:N S:N 4.0
201076420 3 PKPC 2026-09-08 APPR Criteria 8 T:N O:N S:N 16.0
201076421 3 PKPC 2026-09-08 APPR Criteria 8 T:N O:N S:N 16.0
201076423 3 PKPC 2026-09-08 APPR Criteria 8 T:N O:N S:N 16.0
201253520 3 PKPC 2027-04-21 APPR Criteria 8 T:N O:N S:N 12.0
201258172 3 PKPC 2028-10-27 APPR Criteria 8 T:N O:N S:N 4.0
201266826 3 PKPC 2027-06-11 APPR Criteria 8 T:N O:N S:N 4.0
300320223 3 PKPC 2028-08-17 APPR Criteria 6 T:N O:N S:Y 4.0
300320233 3 PKPC 2028-07-20 APPR Criteria 6 T:N O:N S:Y 4.0
300320301 3 PKPC 2027-08-24 APPR Criteria 6 T:N O:N S:Y 4.0
300320343 3 PKPC 2027-09-18 APPR Criteria 6 T:N O:N S:Y 8.0
300320382 3 PKPC 2027-09-03 APPR Criteria 6 T:N O:N S:Y 8.0
300320554 3 PKPC 2028-08-04 APPR Criteria 6 T:N O:N S:Y 8.0
300320771 3 PKPC 2027-11-11 APPR Criteria 6 T:N O:N S:Y 4.0
300320799 3 PKPC 2029-04-14 APPR Criteria 6 T:N O:N S:Y 4.0
300320802 3 PKPC 2028-09-07 APPR Criteria 6 T:N O:N S:Y 4.0
300320806 3 PKPC 2027-04-14 APPR Criteria 6 T:N O:N S:Y 4.0
300320817 3 PKPC 2027-09-08 APPR Criteria 6 T:N O:N S:Y 4.0
300320821 3 PKPC 2028-09-08 APPR Criteria 6 T:N O:N S:Y 4.0
300320831 3 PKPC 2027-09-25 APPR Criteria 6 T:N O:N S:Y 4.0
100121297 4 PKPC 2026-10-30 APPR Criteria 8 T:N O:N S:N 44.0
100134960 4 PKPC 2027-02-16 APPR Criteria 6 T:N O:N S:Y 16.0
100135088 4 PGTH 2026-10-31 APPR Criteria 8 T:N O:N S:N 16.0
100135089 4 PGTH 2026-10-31 APPR Criteria 8 T:N O:N S:N 16.0
100135090 4 PGTH 2026-10-31 APPR Criteria 8 T:N O:N S:N 16.0
100135187 4 PGTH 2026-10-31 APPR Criteria 8 T:N O:N S:N 16.0
100138296 4 PKPC 2026-10-26 APPR Criteria 8 T:N O:N S:N 100.0
100138314 4 PKPC 2026-10-09 APPR Criteria 8 T:N O:N S:N 100.0
100138315 4 PKPC 2026-10-09 APPR Criteria 8 T:N O:N S:N 100.0
100140332 4 PKPC 2027-07-29 APPR WPLC Criteria 8 T:N O:N S:N 8.0
100118241 5 PKPC 2028-10-26 APPR Criteria 2 T:N O:N S:N 0
100134954 5 PKPC 2028-01-26 APPR Criteria 2 T:N O:N S:N 16.0