SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 98357

98357

PADS: SCOTCH-BRITE, SANDING HEAVY DUTY,SUPPLIED IN PACKS
FPAL 1.3.98.0 · Basic Consumables · Nature Gen.Consum

Категория материала

Tools & Workshop Workshop Consumables Consumable
FPAL2.7.4.0 исправлен
в SAP-выгрузке: 1.3.98.0 — Spare Parts - Gas Compressors

Stock & pipeline (latest SRR snapshot)

Total balance
3.0
Reserved
37.0
Qty in PR
94
Qty in PO
0.0
In refurbishment
0
Price (USD)
$9.47
Moving average (USD)

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий — Нет не заказывали 0 $9.47 ⚠ $92.69 $0.00
July 2026 ✓ Да Other (PR) 94 $9.25 ⚠ $92.69 $869.50
June 2026 — Нет не заказывали 0 $68.95 $92.69 $0.00
May 2026 — Нет не заказывали 0 $70.35 $92.69 $0.00
April 2026 — Нет не заказывали 0 $70.35 $92.69 $0.00
March 2026 — Нет не заказывали 0 $70.35 $92.69 $0.00
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
MECHANICAL
Line Type
General Line
Criticality
3.0
ABC indicator
B
MRP Area / Type / Lot
1000_PKPC · VB · HB
Primary vendor
5000250 Consolidated Supply and Ser
Last PO
26/0383 · 5006550 SUPROS ENGINEERING AND S · 78.0 × 4493.0 KZT

Contracts (FWAs) — 0

This material is not registered in any contract yet.

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 10 active reservations from last SRR snapshot Storage: PKPC
Order Prio Storage Target finish Status Criteria T/O/S Qty
100106130 3 PKPC 2023-11-24 APPR Criteria 8 T:N O:N S:N 2.0
100137888 3 PKPC 2026-07-08 APPR WPLC Criteria 6 T:N O:N S:Y 1.0
201058908 3 PKPC 2026-09-13 APPR Criteria 8 T:N O:N S:N 1.0
201058909 3 PKPC 2026-09-13 APPR Criteria 8 T:N O:N S:N 1.0
201058910 3 PKPC 2026-09-14 APPR Criteria 6 T:N O:N S:Y 1.0
201058911 3 PKPC 2026-09-14 APPR Criteria 8 T:N O:N S:N 1.0
200926838 4 PKPC 2026-09-10 APPR Criteria 8 T:N O:N S:N 1.0
200967268 4 PKPC 2024-07-12 WPRE APPR Criteria 8 T:N O:N S:N 1.0
500142750 4 PKPC 2024-10-27 APPR Criteria 8 T:N O:N S:N 27.0
100137678 5 PKPC 2026-09-08 WPLC APPR Criteria 2 T:N O:N S:N 1.0