SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 80093

80093

HEATER, ELECTRIC: TYPE EHP 200, 200W, 110-250VAC, - 60°C - +80°C, Cable Gland: M20 x 1,5, Nickel Plated Brass, IP 68, II 2 G Ex d IIC T4 / T3 Gb, SELF REGULATING, FOR FORES CONTROL PANEL, TAG NO.HE1/4
FPAL 1.6.3.0 · Basic Operational / Recommended Spares · Nature Non-wear

Категория материала

Electrical Equipment & Materials Cable Glands / Adaptors Consumable
FPAL1.6.3.0

Stock & pipeline (latest SRR snapshot)

Total balance
6.0
Reserved
10.0
Qty in PR
0
Qty in PO
6.0
In refurbishment
0
Price (USD)
$2,275
Moving average (USD)

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий — Нет не заказывали 0 $2,275 $2,003 $0.00
July 2026 — Нет не заказывали 0 $2,275 $2,003 $0.00
June 2026 — Нет не заказывали 0 $2,275 $2,003 $0.00
May 2026 — Нет не заказывали 0 $2,275 $2,003 $0.00
April 2026 — Нет не заказывали 0 $2,164 $2,003 $0.00
March 2026 — Нет не заказывали 0 $2,164 $2,003 $0.00
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
ELECTRICAL
Line Type
General Line
Criticality
3.0
ABC indicator
C
MRP Area / Type / Lot
1000_PGTH · VB · HB
Primary vendor
2001435 FORES ENGINEERING SRL
Last PO
26/C/00081 · 5002735 GLOBAL PROCUREMENT LLP · 6.0 × 2275.03 USD

Contracts (FWAs) — 1

GLOBAL PROCUREMENT LLP
ESPE
unclaimed

Comments from latest SRR

Calculation: Rule 1

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles · owned by ESPE

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 1 active reservations from last SRR snapshot Storage: PGTH
Order Prio Storage Target finish Status Criteria T/O/S Qty
100119340 5 PGTH 2028-11-28 APPR Criteria 2 T:N O:N S:N 0