SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 70432

70432

GLAND, CABLE: 20MM, ZINC PLATED, EEXD, FOR SWA CABLE C/W LOCKNUT, EARTH TAG, IP WASHER, ZERO HALOGEN SHROUD, SUITABLE FOR AMBIENT TEMPERATURE RANGE -44 TO +41 DEG C AND ALL OTHER ENVIRONMENTAL CONDITIONS AS PER SPECIFICATION 23858-00L-3PS-0000-00 003 REV.
FPAL 1.9.9.0 · Basic Consumables · Nature Consumable

Категория материала

Rotating Equipment Pumps Spare
FPAL1.9.9.0 из SAP

Stock & pipeline (latest SRR snapshot)

Total balance
18.0
Reserved
0.0
Qty in PR
0
Qty in PO
65.0
In refurbishment
0
Price (USD)
$66.67
Moving average (USD)

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий — Нет не заказывали 0 $66.67 $21.75 $0.00
July 2026 — Нет не заказывали 0 $66.67 $21.75 $0.00
June 2026 — Нет не заказывали 0 $54.35 $24.14 $0.00
May 2026 — Нет не заказывали 0 $54.35 $24.14 $0.00
April 2026 — Нет не заказывали 0 $22.08 $24.14 $0.00
March 2026 — Нет не заказывали 0 $22.49 $24.14 $0.00
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
ELECTRICAL
Line Type
General Line
Criticality
3.0
ABC indicator
C
MRP Area / Type / Lot
1000_PGTH · VB · HB
Primary vendor
2000199 R and M ELECTRICAL GROUP LI
Manufacturer
PEPPERS CABLE GLANDS LIMITED · PEPPERS
Last PO
26/C/02215 · 5002735 GLOBAL PROCUREMENT LLP · 20.0 × 66.67 USD

Contracts (FWAs) — 1

GLOBAL PROCUREMENT LLP
ESPE
unclaimed

Comments from latest SRR

Calculation: Rule 1

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles · owned by ESPE

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.