SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 70179

70179

BRG, BALL: ID30MM; OD62MM; W16MM; DESIGN: DEEP GROOVE; BORE: CYLINDRICAL; CAGE MATERIAL STEEL; RADIAL INTERNAL CLEARANCE: C3; SEALING: SHIELD ON BOTH SIDES
FPAL 2.3.8.0 · Basic Operational / Recommended Spares · Nature Wear

Категория материала

Static & Mechanical Equipment Bearings Spare
FPAL2.3.8.0 из SAP

Stock & pipeline (latest SRR snapshot)

Total balance
7.0
Reserved
8.0
Qty in PR
0
Qty in PO
13.0
In refurbishment
0
Price (USD)
$16.76
Moving average (USD)

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий — Нет не заказывали 0 $16.76 $12.71 $0.00
July 2026 — Нет не заказывали 0 $16.76 $12.71 $0.00
June 2026 — Нет не заказывали 0 $16.76 $12.71 $0.00
April 2026 ✓ Да No Fixed 2 $11.83 $12.71 $23.66
March 2026 — Нет не заказывали 0 $18.78 $12.71 $0.00
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
MECHANICAL
Line Type
General Line
Criticality
3.0
ABC indicator
C
MRP Area / Type / Lot
1000_PKPC · VB · HB
Primary vendor
2001069 SKF EUROTRADE AB
Manufacturer
SKF ENGINEERING PRODUCTS · SKF
Last PO
26/C/00655 · 5004671 MARINE SUPPORT SERVICES · 19.0 × 16.76 USD

Contracts (FWAs) — 1

MARINE SUPPORT SERVICES LLP
RSPE
unclaimed

Comments from latest SRR

Calculation: Rule 6

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles · owned by RSPE

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 15 active reservations from last SRR snapshot Storage: PKPC PUN2
Order Prio Storage Target finish Status Criteria T/O/S Qty
201090680 3 PKPC 2026-09-06 APPR Criteria 8 T:N O:N S:N 1.0
201100327 3 PKPC 2026-10-09 APPR Criteria 8 T:N O:N S:N 2.0
201166587 3 PUN2 2026-06-13 APPR Criteria 8 T:N O:N S:N 2.0
201166589 3 PUN2 2026-06-13 APPR Criteria 8 T:N O:N S:N 2.0
201166828 3 PUN2 2026-06-14 APPR Criteria 8 T:N O:N S:N 1.0
201166830 3 PUN2 2026-06-14 APPR Criteria 8 T:N O:N S:N 2.0
201166832 3 PUN2 2026-06-14 APPR Criteria 8 T:N O:N S:N 2.0
201167096 3 PUN2 2026-06-15 APPR Criteria 8 T:N O:N S:N 2.0
201174907 3 PUN2 2029-07-05 APPR Criteria 8 T:N O:N S:N 1.0
201174909 3 PUN2 2029-07-06 APPR Criteria 8 T:N O:N S:N 1.0
201176517 3 PKPC 2029-07-19 APPR Criteria 8 T:N O:N S:N 1.0
201188593 3 PKPC 2027-09-03 APPR Criteria 8 T:N O:N S:N 1.0
201190441 3 PKPC 2027-09-11 APPR Criteria 8 T:N O:N S:N 1.0
201261584 3 PKPC 2029-09-06 APPR Criteria 8 T:N O:N S:N 1.0
201180311 5 PKPC 2027-06-30 APPR Criteria 2 T:N O:N S:N 1.0