SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 6756

6756

WASHER, LOCK: CONNECTIN GROD, STEEL, FOR GLYCOL/PROCESS WATER REINJECTION PUMP
FPAL 1.4.98.0 · Basic Critical Spares · Nature Consumable

Категория материала

Rotating Equipment Pumps Spare
FPAL1.4.98.0

Stock & pipeline (latest SRR snapshot)

Total balance
0.0
Reserved
48.0
Qty in PR
26
Qty in PO
0.0
In refurbishment
0
Price (USD)
$14.24
Moving average (USD)
Revised SRR qty
28.0
Revised SRR value
$398.72

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да Other (PR) 28 $14.24 $14.28 $398.72
July 2026 ✓ Да Other (PR) 28 $14.15 $14.28 $396.20
June 2026 ✓ Да Other (PR) 28 $14.45 $14.28 $404.60
May 2026 ✓ Да Other (PR) 20 $14.53 $14.28 $290.60
April 2026 ✓ Да Other (PR) 20 $14.26 $14.28 $285.20
March 2026 ✓ Да Other (PR) 20 $14.64 $14.28 $292.80
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
MECHANICAL
Line Type
General Line
Criticality
1.0
ABC indicator
C
MRP Area / Type / Lot
1000_PUN2 · PD · HB
Primary vendor
2005185 PLEUGER INDUSTRIES GMBH
Manufacturer
PLEUGER Industries GmbH · PLEUGER
Last PO
20/C/04661 · 5002410 FLOWSERVE KAZAKHSTAN LLP · 26.0 × 12.41 EUR

Contracts (FWAs) — 0

This material is not registered in any contract yet.

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 8 active reservations from last SRR snapshot Storage: PUN2
Order Prio Storage Target finish Status Criteria T/O/S Qty
100134414 3 PUN2 2027-02-09 APPR Criteria 8 T:N O:N S:N 6.0
200970136 3 PUN2 2024-08-21 APPR Criteria 8 T:N O:N S:N 6.0
201050786 3 PUN2 2026-01-01 APPR Criteria 8 T:N O:N S:N 6.0
201050791 3 PUN2 2025-09-29 APPR Criteria 8 T:N O:N S:N 6.0
201118241 3 PUN2 2026-08-06 APPR Criteria 8 T:N O:N S:N 6.0
201122489 3 PUN2 2026-08-22 APPR Criteria 8 T:N O:N S:N 6.0
201216738 3 PUN2 2027-08-05 APPR Criteria 8 T:N O:N S:N 6.0
201221204 3 PUN2 2027-08-21 APPR Criteria 8 T:N O:N S:N 6.0