Worklist · Material · 54941

54941

FAN: MODEL 7855-S, UPS PANEL, ELECTRIC, AIRSERV, AISI316, 230V, FOR UPS PANEL UNIT, MAY CONSIST OF: CABLE TERMINALS (BLUE) – 1 EA. – FOR NEUTRAL WIRE CABLE TERMINALS (RED) – 1 EA. - PHASE WIRE INSTALLATION BOLTS (SCREWS) – 2 EA. PLAIN WASHERS – 2 EA
FPAL 1.3.5.0 · Basic Operational / Recommended Spares · Nature Wear

Категория материала

Rotating Equipment Compressors / Blowers / Fans Spare
FPAL1.3.5.0

Stock & pipeline (latest SRR snapshot)

Total balance
32.0
Reserved
40.0
Qty in PR
0
Qty in PO
4.0
In refurbishment
0
Price (USD)
$438.30
Moving average (USD)
Revised SRR qty
8.0
Revised SRR value
$3,506

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да No Fixed 8 $438.30 $405.44 $3,506
July 2026 ✓ Да Fixed Scope 4 $435.70 $405.44 $1,743
June 2026 ✓ Да Fixed Scope 4 $444.79 $405.44 $1,779
May 2026 ✓ Да Fixed Scope 4 $447.32 $405.44 $1,789
March 2026 ✓ Да No Fixed 4 $450.68 $405.44 $1,803
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
ELECTRICAL
Line Type
General Line
Criticality
1.0
ABC indicator
C
MRP Area / Type / Lot
1000_PUN2 · VB · HB
Manufacturer
CEG Electronica industriale · CEG
Last PO
25/C/09711 · 2004695 NUOVO PIGNONE INTERNATIO · 4.0 × 382.06 EUR

Contracts (FWAs) — 1

NUOVO PIGNONE INTERNATIONAL SRL
RSPE
unclaimed

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles · owned by RSPE

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 10 active reservations from last SRR snapshot Storage: PUN2
Order Prio Storage Target finish Status Criteria T/O/S Qty
200927446 3 PUN2 2027-09-20 APPR Criteria 6 T:N O:N S:Y 4.0
200935547 3 PUN2 2027-11-15 APPR Criteria 6 T:N O:N S:Y 4.0
200935548 3 PUN2 2027-11-16 APPR Criteria 6 T:N O:N S:Y 4.0
200935549 3 PUN2 2027-11-17 APPR Criteria 6 T:N O:N S:Y 4.0
200935550 3 PUN2 2027-11-15 APPR Criteria 6 T:N O:N S:Y 4.0
201095633 3 PUN2 2027-09-22 APPR Criteria 6 T:N O:N S:Y 4.0
201095634 3 PUN2 2027-09-22 APPR Criteria 6 T:N O:N S:Y 4.0
201170891 3 PUN2 2027-11-22 APPR Criteria 6 T:N O:N S:Y 4.0
201229273 3 PUN2 2027-11-16 APPR Criteria 6 T:N O:N S:Y 4.0
201274554 3 PUN2 2028-09-20 APPR Criteria 8 T:N O:N S:N 4.0