SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 53741

53741

KIT, CARTRIDGE: FOR SEAL GAS FILTER, CONSIST OF 2 CATRIDGES AND 2 O-RINGS, ITEMS 24 AND 26 OF THE DRAWING SOS88094, FOR CENTRIFUGAL COMPRESSOR FOR COMPRESSOR INSTRUMENTS
FPAL 1.3.98.0 · Basic Critical Spares · Nature Consumable

Категория материала

Rotating Equipment Compressors / Blowers / Fans Spare
FPAL1.3.98.0

Stock & pipeline (latest SRR snapshot)

Total balance
0.0
Reserved
23.0
Qty in PR
0
Qty in PO
50.0
In refurbishment
0
Price (USD)
$3,546
Moving average (USD)
Revised SRR qty
21.0
Revised SRR value
$74,472

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да No Fixed 21 $3,546 $3,241 $74,472
July 2026 ✓ Да Fixed Scope 39 $1,149 $3,241 $44,825
June 2026 ✓ Да Fixed Scope 25 $1,130 $3,241 $28,246
May 2026 ✓ Да Fixed Scope 24 $1,130 $3,241 $27,117
April 2026 ✓ Да Fixed Scope 23 $1,470 $3,241 $33,801
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
MECHANICAL
Line Type
General Line
Criticality
1.0
ABC indicator
A
MRP Area / Type / Lot
1000_PUN2 · VB · HB
Manufacturer
Nuovo Pignone · NUOVOPIGN
Last PO
23/C/05630 · 2004695 NUOVO PIGNONE INTERNATIO · 6.0 × 3091.26 EUR

Contracts (FWAs) — 1

NUOVO PIGNONE INTERNATIONAL SRL
RSPE
unclaimed

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles · owned by RSPE

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 26 active reservations from last SRR snapshot Storage: PUN2
Order Prio Storage Target finish Status Criteria T/O/S Qty
100132734 2 PUN2 2025-12-25 WPLC APPR Criteria 8 T:N O:N S:N 1.0
100131820 3 PUN2 2026-01-16 WPLC APPR Criteria 8 T:N O:N S:N 1.0
100132016 3 PUN2 2026-01-22 APPR Criteria 8 T:N O:N S:N 1.0
100132465 3 PUN2 2025-12-12 APPR Criteria 8 T:N O:N S:N 1.0
100132466 3 PUN2 2026-02-04 APPR Criteria 8 T:N O:N S:N 1.0
100132746 3 PUN2 2026-02-12 APPR Criteria 8 T:N O:N S:N 1.0
100132788 3 PUN2 2025-12-24 APPR Criteria 8 T:N O:N S:N 1.0
100133019 3 PUN2 2026-02-20 APPR Criteria 8 T:N O:N S:N 1.0
100133020 3 PUN2 2026-02-20 APPR Criteria 8 T:N O:N S:N 1.0
100133041 3 PUN2 2026-02-21 APPR Criteria 8 T:N O:N S:N 1.0
100133042 3 PUN2 2026-02-21 APPR Criteria 8 T:N O:N S:N 1.0
100133651 3 PUN2 2026-01-14 APPR Criteria 8 T:N O:N S:N 1.0
100133862 3 PUN2 2026-01-20 APPR Criteria 8 T:N O:N S:N 1.0
100134499 3 PUN2 2026-04-02 APPR Criteria 8 T:N O:N S:N 1.0
100134704 3 PUN2 2026-04-07 APPR Criteria 8 T:N O:N S:N 1.0
100134781 3 PUN2 2026-04-09 APPR Criteria 8 T:N O:N S:N 1.0
100134782 3 PUN2 2026-04-09 APPR Criteria 8 T:N O:N S:N 1.0
100135099 3 PUN2 2026-04-16 APPR Criteria 8 T:N O:N S:N 1.0
100135793 3 PUN2 2027-04-04 APPR Criteria 4 T:N O:Y S:Y 60.0
100135822 3 PUN2 2026-03-16 APPR Criteria 8 T:N O:N S:N 1.0
100135841 3 PUN2 2026-03-16 APPR Criteria 8 T:N O:N S:N 1.0
100136156 3 PUN2 2026-05-18 APPR Criteria 8 T:N O:N S:N 1.0
100137451 3 PUN2 2026-05-15 APPR Criteria 8 T:N O:N S:N 1.0
100139608 3 PUN2 2026-07-10 APPR Criteria 8 T:N O:N S:N 1.0
100140009 3 PUN2 2026-07-31 APPR Criteria 8 T:N O:N S:N 1.0
100137415 4 PUN2 2026-05-30 APPR Criteria 8 T:N O:N S:N 1.0