SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 47878

47878

PULLEY, DRIVE: NMDFR, FOR HEAT EXCHANGER, CAST IRON GS400, MANUFACTURER: SPBT150SPB4 (OBSOLETE) 150.4SPB2517 (NEW)
FPAL 1.7.98.0 · Basic Operational / Recommended Spares · Nature Wear

Категория материала

Static & Mechanical Equipment Heat Exchangers / Air Coolers Spare
FPAL1.7.98.0

Stock & pipeline (latest SRR snapshot)

Total balance
0.0
Reserved
4.0
Qty in PR
0
Qty in PO
3.0
In refurbishment
0
Price (USD)
$900.38
Moving average (USD)
Revised SRR qty
2.0
Revised SRR value
$1,801

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да No Fixed 2 $900.38 $865.31 $1,801
July 2026 ✓ Да Fixed Scope 2 $895.04 $865.31 $1,790
June 2026 ✓ Да Fixed Scope 2 $913.72 $865.31 $1,827
May 2026 ✓ Да Fixed Scope 3 $918.90 $865.31 $2,757
March 2026 ✓ Да No Fixed 1 $925.81 $865.31 $925.81
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
MECHANICAL
Line Type
General Line
Criticality
3.0
ABC indicator
C
MRP Area / Type / Lot
1000_PUN2 · PD · HB
Primary vendor
2004695 NUOVO PIGNONE INTERNATIONAL
Manufacturer
SIT SPA · SITSPA
Last PO
25/C/09711 · 2004695 NUOVO PIGNONE INTERNATIO · 3.0 × 784.85 EUR

Contracts (FWAs) — 1

NUOVO PIGNONE INTERNATIONAL SRL
RSPE
unclaimed

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles · owned by RSPE

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 4 active reservations from last SRR snapshot Storage: PUN2
Order Prio Storage Target finish Status Criteria T/O/S Qty
100129283 3 PUN2 2025-11-10 APPR Criteria 8 T:N O:N S:N 1.0
100129284 3 PUN2 2025-11-10 APPR Criteria 8 T:N O:N S:N 1.0
100134750 3 PUN2 2027-04-08 APPR Criteria 4 T:N O:Y S:Y 1.0
100137012 3 PUN2 2026-06-11 APPR Criteria 8 T:N O:N S:N 1.0