SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 43215

43215

MONITOR: PROXIMITOR/SEISMIC, INPUT IMPEDANCE 10KΩ STANDARD I/O, 7.7W POWER CONSUMPTION, FOR CENTRIFUGAL PUMP MONITOR RACK
FPAL 1.4.98.0 · Basic Critical Spares · Nature Gen.Consum

Категория материала

Rotating Equipment Pumps Spare
FPAL1.4.98.0 из SAP

Stock & pipeline (latest SRR snapshot)

Total balance
1.0
Reserved
2.0
Qty in PR
2
Qty in PO
0.0
In refurbishment
0
Price (USD)
$5,797
Moving average (USD)
Revised SRR qty
1.0
Revised SRR value
$5,797

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да Other (PR) 1 $5,797 $5,820 $5,797
July 2026 — Нет не заказывали 0 $5,797 $5,820 $0.00
June 2026 — Нет не заказывали 0 $5,797 $5,820 $0.00
May 2026 — Нет не заказывали 0 $5,797 $5,820 $0.00
April 2026 — Нет не заказывали 0 $5,797 $5,820 $0.00
March 2026 — Нет не заказывали 0 $5,797 $5,820 $0.00
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
ELECTRICAL
Line Type
General Line
Criticality
1.0
ABC indicator
C
MRP Area / Type / Lot
1000_PKPC · VB · HB
Primary vendor
2001704 BENTLY NEVADA INC
Manufacturer
Bently Nevada UK · BENTLYNEV
Last PO
24/C/00815 · 5006562 BAKER HUGHES SERVICES KA · 23.0 × 5797.2 USD

Contracts (FWAs) — 0

This material is not registered in any contract yet.

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 1 active reservations from last SRR snapshot Storage: PKPC
Order Prio Storage Target finish Status Criteria T/O/S Qty
100095496 5 PKPC 2023-10-03 APPR Criteria 1 T:N O:N S:N 2.0