Worklist · Material · 223369

223369

SHEET, ALUMINIUM JACKETING: 0.914~1M WIDTH X 0.9MM THICK X 30M LENGTH, WITH AN INTEGRAL CONTINUOUSLY HEAT SEALED POLYSURLYN MOISTURE BARRIER, SUPPLIED IN ROLL, SPECIFICATION OF ALUMINIUM: ALLOY 5005 OR 3003 – H14 OR H16 TEMPER IN ACCORDANCE WITH ASTM B209
FPAL 2.8.2.0 · Basic Consumables · Nature Gen.Consum

Категория материала

Insulation & Refractory Cladding / Foil / Jacketing Bulk
FPAL2.8.2.0 из SAP

Stock & pipeline (latest SRR snapshot)

Total balance
16.0
Reserved
72.0
Qty in PR
0
Qty in PO
0.0
In refurbishment
0
Price (USD)
$484.49
Moving average (USD)

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий — Нет не заказывали 0 $484.49 $477.30 $0.00
July 2026 — Нет не заказывали 0 $473.33 $441.34 $0.00
April 2026 ✓ Да Fixed Scope 20 $477.54 $441.34 $9,551
March 2026 ✓ Да No Fixed 30 $457.24 $441.34 $13,717
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
PIPING
Line Type
General Line
Criticality
3.0
ABC indicator
C
MRP Area / Type / Lot
1000_PKPC · VB · HB
Primary vendor
5000043 ARIADNA LLP
Manufacturer
Not applicable - ie pipeline...
Last PO
26/C/02266 · 5006550 SUPROS ENGINEERING AND S · 38.0 × 229955.0 KZT

Contracts (FWAs) — 1

MAMYR LLP
GSPE
unclaimed

Comments from latest SRR

Calculation: Rule 1

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles · owned by GSPE

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 18 active reservations from last SRR snapshot Storage: PKPC
Order Prio Storage Target finish Status Criteria T/O/S Qty
500154133 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154139 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154155 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154185 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154187 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154193 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154194 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154195 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154196 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154197 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154198 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154199 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154200 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154201 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154202 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154203 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154221 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154222 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0