SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 19956

19956

SET, PACKING: UTEX0758, FOR SKIMMED OIL PUMP, CONSIST OF: 1) RETAINER; 2) SINGLE TURN BACK-UP; 3) O-RING; 4) TOP ADAPTER; 5) "SF" PRESSURE RING; 6) BOTTOM ADAPTER; 7) SPRING; 8) SPACER; 9) SNAP RING
FPAL 1.4.98.0 · Basic Consumables · Nature Wear

Категория материала

Rotating Equipment Pumps Spare
FPAL1.4.98.0

Stock & pipeline (latest SRR snapshot)

Total balance
0.0
Reserved
43.0
Qty in PR
14
Qty in PO
0.0
In refurbishment
0
Price (USD)
$2,466
Moving average (USD)
Revised SRR qty
41.0
Revised SRR value
$101,106

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да Other (PR) 41 $2,466 $2,488 $101,106
July 2026 ✓ Да Other (PR) 41 $2,466 $2,488 $101,106
June 2026 ✓ Да Other (PR) 41 $2,466 $2,488 $101,106
May 2026 ✓ Да Other (PR) 26 $2,466 $2,488 $64,116
April 2026 ✓ Да Other (PR) 26 $2,466 $2,488 $64,116
March 2026 ✓ Да Other (PR) 26 $2,466 $2,488 $64,116
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
MECHANICAL
Line Type
General Line
Criticality
3.0
ABC indicator
B
MRP Area / Type / Lot
1000_PUN2 · VB · HB
Primary vendor
2005185 PLEUGER INDUSTRIES GMBH
Manufacturer
PLEUGER Industries GmbH · PLEUGER
Last PO
23/0395 · 5006106 ASKU ENERGY LLP · 25.0 × 2466.01 USD

Contracts (FWAs) — 0

This material is not registered in any contract yet.

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 7 active reservations from last SRR snapshot Storage: PUN2
Order Prio Storage Target finish Status Criteria T/O/S Qty
100134414 3 PUN2 2027-02-09 APPR Criteria 8 T:N O:N S:N 12.0
201050786 3 PUN2 2026-01-01 APPR Criteria 8 T:N O:N S:N 1.0
201050791 3 PUN2 2025-09-29 APPR Criteria 8 T:N O:N S:N 6.0
201118241 3 PUN2 2026-08-06 APPR Criteria 8 T:N O:N S:N 6.0
201122489 3 PUN2 2026-08-22 APPR Criteria 8 T:N O:N S:N 6.0
201216738 3 PUN2 2027-08-05 APPR Criteria 8 T:N O:N S:N 6.0
201221204 3 PUN2 2027-08-21 APPR Criteria 8 T:N O:N S:N 6.0