SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 19948

19948

BOLT,ROD CONNECTING: GLYCOL/WATER REINJECTION PUMP, BOLT:CONNECTINGROD,AISI4140,FORGLYCOL/PROCESSWATERRE-INJECTIONPUMPP/N84510940
FPAL 1.4.98.0 · Basic Critical Spares · Nature Consumable

Категория материала

Rotating Equipment Pumps Equipment
FPAL1.4.98.0

Stock & pipeline (latest SRR snapshot)

Total balance
0.0
Reserved
54.0
Qty in PR
36
Qty in PO
0.0
In refurbishment
0
Price (USD)
$62.02
Moving average (USD)
Revised SRR qty
24.0
Revised SRR value
$1,488

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да Other (PR) 24 $62.02 $94.59 $1,488
July 2026 ✓ Да Other (PR) 24 $61.65 $94.59 $1,480
June 2026 ✓ Да Other (PR) 24 $62.94 $94.59 $1,511
May 2026 ✓ Да Other (PR) 12 $63.29 $94.59 $759.48
April 2026 ✓ Да Other (PR) 12 $62.11 $94.59 $745.32
March 2026 ✓ Да Other (PR) 12 $63.77 $94.59 $765.24
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
MECHANICAL
Line Type
General Line
Criticality
1.0
ABC indicator
C
MRP Area / Type / Lot
1000_PUN2 · VB · HB
Primary vendor
2005185 PLEUGER INDUSTRIES GMBH
Manufacturer
PLEUGER Industries GmbH · PLEUGER
Last PO
19/C/01668 · 5002410 FLOWSERVE KAZAKHSTAN LLP · 12.0 × 54.06 EUR

Contracts (FWAs) — 0

This material is not registered in any contract yet.

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 9 active reservations from last SRR snapshot Storage: PUN2
Order Prio Storage Target finish Status Criteria T/O/S Qty
100134414 3 PUN2 2027-02-09 APPR Criteria 8 T:N O:N S:N 6.0
200966472 3 PUN2 2024-12-31 APPR Criteria 8 T:N O:N S:N 6.0
200970136 3 PUN2 2024-08-21 APPR Criteria 8 T:N O:N S:N 6.0
201050786 3 PUN2 2026-01-01 APPR Criteria 8 T:N O:N S:N 6.0
201050791 3 PUN2 2025-09-29 APPR Criteria 8 T:N O:N S:N 6.0
201118241 3 PUN2 2026-08-06 APPR Criteria 8 T:N O:N S:N 6.0
201122489 3 PUN2 2026-08-22 APPR Criteria 8 T:N O:N S:N 6.0
201216738 3 PUN2 2027-08-05 APPR Criteria 8 T:N O:N S:N 6.0
201221204 3 PUN2 2027-08-21 APPR Criteria 8 T:N O:N S:N 6.0