Worklist · Material · 123319

123319

CARD: R-C,G.C. 110 DC, TYPE GC-110 DICAGI
FPAL 1.9.98.0 · Basic Operational / Recommended Spares · Nature Wear

Категория материала

Instrumentation & Process Control Control Panels / PLC / DCS Spare
FPAL1.10.96.0 из SAP
в SAP-выгрузке: 1.9.98.0 — Sprs/Mat.Electrical Eq-t

Stock & pipeline (latest SRR snapshot)

Total balance
0.0
Reserved
0.0
Qty in PR
0
Qty in PO
0.0
In refurbishment
0
Price (USD)
$213.91
Moving average (USD)
Revised SRR qty
1.0
Revised SRR value
$213.91

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да Other (PR) 1 $213.91 $189.71 $213.91
July 2026 ✓ Да Other (PR) 1 $213.91 $189.71 $213.91
May 2026 ✓ Да Other (PR) 2 $213.91 $189.71 $427.82
April 2026 ✓ Да Other (PR) 36 $213.91 $189.71 $7,701
March 2026 ✓ Да Other (PR) 36 $213.91 $189.71 $7,701
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
ELECTRICAL
Line Type
General Line
Criticality
2.0
ABC indicator
C
MRP Area / Type / Lot
1000_PKPC · PD · HB
Primary vendor
2001759 CEG ELETTRONICA INDUSTRIALE
Manufacturer
CEG Electronica industriale · CEG
Last PO
21/C/00819 · 5005495 NURSAI ENERGY LLP · 8.0 × 213.91 USD

Contracts (FWAs) — 0

This material is not registered in any contract yet.

Comments from latest SRR

Calculation: Rule 3

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 10 active reservations from last SRR snapshot Storage: PUN2
Order Prio Storage Target finish Status Criteria T/O/S Qty
200927446 3 PUN2 2027-09-20 APPR Criteria 6 T:N O:N S:Y 4.0
200935547 3 PUN2 2027-11-15 APPR Criteria 6 T:N O:N S:Y 4.0
200935548 3 PUN2 2027-11-16 APPR Criteria 6 T:N O:N S:Y 4.0
200935549 3 PUN2 2027-11-17 APPR Criteria 6 T:N O:N S:Y 4.0
200935550 3 PUN2 2027-11-15 APPR Criteria 6 T:N O:N S:Y 4.0
201095633 3 PUN2 2027-09-22 APPR Criteria 6 T:N O:N S:Y 4.0
201095634 3 PUN2 2027-09-22 APPR Criteria 6 T:N O:N S:Y 4.0
201170891 3 PUN2 2027-11-22 APPR Criteria 6 T:N O:N S:Y 4.0
201229273 3 PUN2 2027-11-16 APPR Criteria 6 T:N O:N S:Y 4.0
201274554 3 PUN2 2028-09-20 APPR Criteria 8 T:N O:N S:N 4.0