Worklist · Material · 117574

117574

BARRIER: TYPE MTL4541B REPEATER POWER SUPPLY 4/20MA, HART, FOR 2- OR 3-WIRE TRANSMITTERS
FPAL 1.10.96.0 · Basic Consumables · Nature Wear

Категория материала

Instrumentation & Process Control Control Panels / PLC / DCS Spare
FPAL1.10.96.0 из SAP

Stock & pipeline (latest SRR snapshot)

Total balance
5.0
Reserved
20.0
Qty in PR
10
Qty in PO
0.0
In refurbishment
0
Price (USD)
$789.17
Moving average (USD)

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий — Нет не заказывали 0 $789.17 $606.95 $0.00
July 2026 — Нет не заказывали 0 $880.11 $579.61 $0.00
June 2026 ✓ Да No Fixed 4 $880.11 $579.61 $3,520
May 2026 — Нет не заказывали 0 $1,018 $579.61 $0.00
April 2026 ✓ Да Other (PR) 6 $508.83 $589.04 $3,053
March 2026 ✓ Да No Fixed 6 $508.83 $589.04 $3,053
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
INSTRUMENT
Line Type
General Line
Criticality
3.0
ABC indicator
C
MRP Area / Type / Lot
1000_PKPC · VB · HB
Primary vendor
2004525 EATON ELECTRICAL SYSTEMS LI
Manufacturer
MTL INSTRUMENT GROUP · MTLINSTR
Last PO
26/0340 · 5003458 SIGMA SOLUTIONS LLP · 2.0 × 789.17 USD

Contracts (FWAs) — 1

GLOBAL PROCUREMENT LLP
ESPE
unclaimed

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles · owned by ESPE

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 2 active reservations from last SRR snapshot Storage: PKPC
Order Prio Storage Target finish Status Criteria T/O/S Qty
100113437 4 PKPC 2025-06-02 APPR Criteria 8 T:N O:N S:N 10.0
100113406 5 PKPC 2024-07-29 APPR Criteria 1 T:N O:N S:N 0