SRR Analytics
WPS Experts
No experts yet. Add them in Settings → Эксперты.
MRP Controllers
Managers
Worklist · Material · 10757

10757

TAPE FIXING: TYPE ATE-180, MATERIAL ALUMINIUM, SELF-ADHESIVE, DIMENSIONS LENGTH 55 M X WIDTH 63.5 MM
FPAL 2.8.2.0 · Basic Consumables · Nature Gen.Consum

Категория материала

Insulation & Refractory Cladding / Foil / Jacketing Consumable
FPAL2.8.2.0 из SAP

Stock & pipeline (latest SRR snapshot)

Total balance
735.0
Reserved
900.0
Qty in PR
0
Qty in PO
0.0
In refurbishment
0
Price (USD)
$24.57
Moving average (USD)
Revised SRR qty
207.0
Revised SRR value
$5,086

История по SRR

Период Заказывали? Бакет Total Qty Price USD Moving avg Total Value USD
August 2026 · текущий ✓ Да No Fixed 207 $24.57 $36.42 $5,086
July 2026 ✓ Да Fixed Scope 207 $39.40 $36.42 $8,156
June 2026 — Нет не заказывали 0 $39.40 $36.42 $0.00
May 2026 — Нет не заказывали 0 $34.92 $36.42 $0.00
April 2026 ✓ Да Fixed Scope 97 $34.92 $36.67 $3,387
March 2026 — Нет не заказывали 0 $34.92 $36.84 $0.00
Красным — цена расходится с moving average в 5+ раз (возможная ошибка в PO/выгрузке).

Specs & sourcing

Discipline (snapshot)
MECHANICAL
Line Type
General Line
Criticality
3.0
ABC indicator
C
MRP Area / Type / Lot
1000_PGTH · VB · HB
Primary vendor
2001254 TYCO THERMAL CONTROLS UK LT
Manufacturer
Raychem HTS · RAYCHEM
Last PO
26/C/05796 · 1532.0 × 11662.0 KZT

Contracts (FWAs) — 1

MAMYR LLP
GSPE
unclaimed

Comments from latest SRR

Calculation: Rule 7

Comment: Order Qty as per MinMax Level Only. Reffer To MDEV List

MRP Controller comments — persists across SRR cycles · owned by GSPE

Select an MRP Controller in the top-right to add comments.
No comments yet. Comments added here will appear on this material in every future SRR cycle.
🔧 Work Orders 20 active reservations from last SRR snapshot Storage: PGTH PKPC PUN2
Order Prio Storage Target finish Status Criteria T/O/S Qty
100131798 4 PGTH 2026-11-20 APPR Criteria 8 T:N O:N S:N 400.0
500144825 4 PGTH 2025-01-14 APPR Criteria 8 T:N O:N S:N 500.0
500143476 5 PKPC 2027-11-19 INPR Criteria 2 T:N O:N S:N 0
500143477 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143478 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143480 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143482 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143483 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143486 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143491 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143493 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143494 5 PKPC 2027-11-19 INPR Criteria 2 T:N O:N S:N 0
500143495 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143496 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143499 5 PKPC 2024-11-19 INPR Criteria 1 T:N O:N S:N 0
500143500 5 PKPC 2027-11-19 INPR Criteria 2 T:N O:N S:N 0
500154197 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500154222 5 PKPC 2025-12-31 INPR Criteria 1 T:N O:N S:N 0
500163346 5 PKPC 2029-06-28 APPR Criteria 2 T:N O:N S:N 0
500169432 5 PUN2 2028-09-30 APPR Criteria 2 T:N O:N S:N 0